File #: 20-274    Version: 1 Name:
Type: Motion Status: Passed
File created: 5/21/2020 In control: City Council
On agenda: 6/2/2020 Final action:
Title: Approve Surface Agreement with United Pacific Railroad for the Third Street Railroad Crossing Improvements.
Attachments: 1. 1 - UPRR Surface Agreement
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
City Council Meeting Date: June 2, 2020

To: Mayor and City Council
City Administrator

From: Sean Simonson, Engineering Manager
Dave Bennett, Public Works Director/City Engineer

Title
Approve Surface Agreement with United Pacific Railroad for the Third Street Railroad Crossing Improvements.

Body
Action Requested:
The Northfield City Council is being asked to pass a Motion approving the Surface Agreement (Attachment 1) with United Pacific Railroad for the Third Street Railroad Crossing Improvements.

Summary Report:
As part of the 2019 Street Reclamation Project Feasibility Report, it was proposed to upgrade the pedestrian crossings at the Third Street railroad crossing located at the east end of the project. Canadian Pacific Railway owns this crossing but the track is leased by Union Pacific Railroad (UPRR). At the time of feasibility and project award, the intention was to add additional precast crossing material at each pedestrian crossing, as was done with the Second Street project a few years previous, to comply with the ADA requirement. This work was estimated at the time of feasibility to be between $30,000 - $40,000. As staff progressed with the proposed work, and after numerous meetings and correspondence with UPRR, the railroad is requiring a full crossing replacement, including the road crossing material, in order to update the pedestrian crossing. This work is estimated to be $135,905.00.

As part of the project already approved, the City of Northfield will be installing medians and ADA improvements on either side of the Third Street railroad crossing.

Alternative Options:
The City Council could choose not to approve the Surface Agreement with UPRR; however, an ADA pedestrian crossing at the railroad would not be completed as originally proposed.

Financial Impacts:
The estimated project costs included in the agreement are $135,905.00. The final costs will be adjusted after the actual work is completed, and final quantities are known ...