File #: 18-074    Version: 1 Name:
Type: Information/Discussion Item Status: Agenda Ready
File created: 1/8/2018 In control: Housing & Redevelopment Authority
On agenda: 2/8/2018 Final action:
Title: Southbridge Area Development Site Concept Review
Attachments: 1. 21073 Southbridge - Concept 1, 2. 21073 Southbridge - Concept 2, 3. 21073 Southbridge - Concept 3, 4. 21073 Southbridge - Concept 4
DATE: February 8, 2018

TO: Members of the Housing & Redevelopment Authority

FROM: Janine Atchison, Housing Coordinator

Title
Southbridge Area Development Site Concept Review

Body
SUMMARY AND ACTION REQUESTED:
Housing & Redevelopment Authority (HRA) to review site concepts plans for HRA owned Southbridge property.

BACKGROUND:
The HRA began partnership discussions with Three Rivers Community Action Agency (Three Rivers) in 2017 develop additional affordable townhomes in the Southbridge Development. The project would increase the number of affordable two and three bedroom rental units at Spring Creek Townhomes built in 2013.

The HRA was also approached by the neighboring property owners (Vern & Joan Koester) regarding a potential land swap of land owned by the HRA for land owned by the Koester's. The HRA obtained site concept plans and soil testing analysis to determine the feasibility of the land trade. Due to time constraints and other considerations, the Koester's decided to move forward with development plans of the adjacent parcel without the land trade.

The HRA engaged ISG to develop additional site concept plans, with storm water drainage considerations, for the HRA owned property.

ANALYSIS:

Staff obtained site concept plans from ISG Engineering. The concept plan utilizes the existing grading from the previous preliminary plat and includes standard development considerations such as street and sidewalk connectivity, proposed lot dimensions, and required setbacks. As stormwater management is a key factor for this site with the proximity to Spring Creek, staff made the decision to expand the scope to include proposed stormwater infiltration areas to provide a more accurate depiction of possible configurations.

The site concept plans provide a view of the configuration of unit types and connectivity. Other issues, such as unit density, will be considered in the preliminary plat stage of development.


Concept 1
* 30+ units for Sp...

Click here for full text