File #: PC Res. 2024-001    Version: 1 Name:
Type: PC Resolution Status: Agenda Ready
File created: 2/12/2024 In control: Planning Commission
On agenda: 2/15/2024 Final action:
Title: Consider Resolution Adopting an Interim Ordinance Limiting Development in the Northwest Area.
Attachments: 1. 1 - Attachment 1 - Visible City Proposal, 2. 2 - Attachment 2 - Draft Resolution NW Area, 3. 3 - Link to AUAR Website
Related files: Ord. 1065, PC Res. 2024-002
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Planning Commission Meeting Date:                     February 15, 2024

 

To:                                          Members of the Planning Commission

 

From:                                          Jake Reilly, Community Development Director

                                          Mikayla Schmidt, City Planner

 

Title

Consider Resolution Adopting an Interim Ordinance Limiting Development in the Northwest Area.

 

Body

Action Requested:                     

Consider and discuss a draft resolution recommending an interim ordinance enacting a moratorium on new development applications in the 530 acres of land known as the Northwest Area.

 

If desired, forward the resolution and related draft ordinance to the City Council for its consideration and for that body to hold a public hearing.

 

Summary Report:

Under Minnesota law (Minn.Stat. §462.355 Subd. 4), a city may adopt an interim ordinance, often called a moratorium, to protect the planning process. Such an ordinance may, “regulate, restrict, or prohibit any use, development, or subdivision within the jurisdiction,” if certain conditions are met. Those conditions include if the municipality is conducting studies (or has authorized a study), has scheduled a public hearing to consider adopting or amending a Comprehensive Plan or official controls, or if the area includes land for which plans and/or controls have not yet been adopted.

 

In the fall of 2023, the Northfield City Council adopted an Alternative Urban Areawide Review (AUAR) (Attachment 3 - link to website) for an area of approximately 787 undeveloped acres (530 acres in the city limits and the remainder in Greenvale Township) northwest of downtown and west of the Northfield Hospital complex. The AUAR is a unique-to-Minnesota environmental review process intended to evaluate cumulative impacts under multiple development scenarios, including the existing scenario described in the 2008 Comprehensive Plan, and consider mitigation strategies. By frontloading environmental review in this way, the AUAR may serve as a development incentive. However, Northfield is now updating its Comprehensive Plan and will revise official controls subsequently. It is an opportune time to complete needed analysis for this region and consider development regulations in a timely way.

 

Northfield’s current Comprehensive Plan was adopted in 2008 and guides this area for commercial and industrial development. The land retains an agricultural zoning designation representing that existing use. However, the zoning is intended to be an interim zoning classification allowing agricultural activities within the city limits on land intended for later development. Northfield annexed approximately 530 acres in 2009 for commercial and industrial development just west of the Northfield Hospital; annexing additional land for commercial and industrial development was identified in the 2006 Comprehensive Economic Development Plan.  No development has occurred in this area except the installation of community solar gardens. 

Updated zoning regulations for the City were adopted in 2011, but the zoning classification intended for this area - the Economic Development Floating Zone or ED-F, was not completed.  Although a draft Master Plan for a business park in this area was prepared in 2011, it was not adopted because of unresolved concerns about infrastructure costs and lack of agreement about the feasibility of any possible commercial or industrial uses in this area which is generally perceived as poorly connected to existing infrastructure and to the center of the community.

 

Since the Comprehensive Plan and land development/zoning regulations were updated, Northfield adopted a Climate Action Plan (CAP) in 2019 which directs the City to, “integrate the Climate Action Plan into policy and plan updates including, but not limited to, the comprehensive plan, Land Development Code, complete streets policies, and others,” (PP7.1, p. 38). Given that this work has not yet been done, the Northfield 2045 Comprehensive Plan process is an ideal time to consider climate as part of land use and capital planning.  In addition, the CAP contains several policy goals for promoting, supporting and preserving agriculture and local food production and for recruiting green businesses for any business park; both are relevant to this area.

 

Northfield has not yet adopted plans or controls for some of the AUAR area and the controls for the annexed portion require more thoughtful review under the CAP and fiscal impact analysis.  Northfield has prioritized increasing the commercial and industrial tax base to reduce the tax burden on residential taxpayers and generally increase the tax base to pay for city services and improvements. However, Northfield has not evaluated how large an increase in tax base is needed for the level of spending anticipated or for the desired reduction in dependence on residential taxpayers. Further, and more critically, the city has not considered how the increased infrastructure and service costs will offset gains in tax revenues.

 

“Under Minnesota property tax law, class rates for commercial and industrial value are 1.50%-2.00%, in contrast to 1.00%-1.25% for residential value. Changes to commercial, industrial, residential and other land uses in the city, along with resulting shifts in property tax revenues, will also result in public costs. While the property tax framework is rigidly standardized statewide, local policy direction about the location, density, and mix of land use is a powerful driver of productivity and economic resilience,” notes Jon Commers, CEO of Visible City, Inc. in a proposal for his firm to study the outcomes associated with recent years; infill development, quantify capacity for expanded infill development areas citywide - those already fully served by public infrastructure - and identify and test areas that appear to be ripe for redevelopment as well as test approaches and mix of uses to commercial and industrial expansion. Staff is negotiating acceptance of that proposal. The draft proposal is attached (Att. 1).

 

Adopting an interim ordinance for this area would allow the City’s staff and elected and appointed officials time without external pressures to determine if any public investment in the relatively disconnected area of the community is justifiable; how and when it might be justified or if there are other alternatives to publicly funded infrastructure; and potentially what types of industrial or commercial users are best-suited to the area while also aligned with stated community goals and/or a vision associated with the 2045 planning horizon. It is also needed to protect the health, safety, and welfare of the public and is in the public’s best interests.

 

A draft resolution and ordinance language for the Council to consider is attached to this staff report (Attachment 2).

 

Alternative Options:

                     Do not recommend enactment of an interim ordinance to the City Council.

                     Change the length of time for the moratorium indicated in the draft interim ordinance.

                     Limit the interim ordinance to a use or set of uses.

 

Financial Impacts:                     

The potential impact of an interim ordinance limiting development is that the City would not be able to accept funds for applications for development in the area. Application fees for development proposals likely to occur in the Northwest Area start at $600.

 

The potential financial impact of allowing development proposals to move forward with a dated Comprehensive Plan as the guide is more likely than not to increase costs to the City, whether through legal fees, unsubsidized development costs for adequate water supply and wastewater treatment facilities.

 

Tentative Timelines:                     

June 2023 to December 2024 - Comprehensive Plan development

February 2024 - Initiate interim ordinance process

March/April 2024 - Public hearing at City Council

December 2024 - Adopt comprehensive Plan

January to June 2025 - Revise and adopt official controls

March/April 2025 - Interim ordinance expires