Title: Consideration of Resolution Ordering Preparation of Feasibility Report for the 2025 Reclamation and Overlay Project.
Attachments: 1. 1 - Res Order Feasibility Report, 2. 2 - Project Process, 3. 3 - 2025 Reclamation and Overlay Location Maps, 4. 4 - 2025 Reclamation and Overlay Approve Feasibility Presentation
City Council Meeting Date: March 12, 2024

To: Mayor and City Council
City Administrator

From: Sean Simonson, Engineering Manager
David Bennett, Public Works Director/City Engineer

Title
Consideration of Resolution Ordering Preparation of Feasibility Report for the 2025 Reclamation and Overlay Project.

Body
Action Requested:
The Northfield City Council approves the attached Resolution ordering the preparation of a feasibility report for the 2025 Reclamation and Overlay Project, STRT2025-A80.
Summary Report:
The approval of the attached resolution (Attachment 1) is the initial step in moving the 2025 Reclamation and Overlay Project, STRT2025-A80. By this resolution, the City Council orders the preparation of a feasibility report. See Attachment 2 for a detailed project process.
The proposed scope of the Reclamation and Overlay Project includes the following street segments: (Attachment 3)
* Maple Street from Jefferson Parkway to Ford Street (Mill & Overlay)
* Lake Drive from Jefferson Parkway to Maple Street (Mill & Overlay)
* Superior Drive from Michigan Drive to Maple Street (Mill & Overlay)
* Washington Street from Sumner Street to the south turnaround (Pavement Reclamation)
* Laurel Court (Pavement Reclamation)
* Industrial Drive (Pavement Reclamation)
The streets listed above are identified in the approved 2024 - 2028 Capital Improvement Plan (CIP). The proposed overlay and reclamation work on the identified streets would improve streets that are currently in a Pavement Condition Index (PCI) Range of 90 - 41. The existing utilities in each of these areas are expected to be in good condition and only require minor spot repairs.
With the development of the Feasibility Report, Staff will reference the Northfield Pedestrian, Bike, and Trail System Plan and the Pedestrian + Bikeway Analyzation for any proposed Sidewalk, On-Street Bikeways, or Off-Street Trail/Path recommended in the plan. Staff is recommending inclusion of the following Walking an...